| |
|
|
| |
Tehachapi Wind Farm Project |
|
| |
|
|
| |
Windland has developed and operated commercial wind projects in
Tehachapi, California since 1982. During that time we have used many
generations of wind turbine generators, from the first generation
25 to 40kW machines up to the Megawatt class turbines on today's
market. Through our many projects Windland has gained a thorough
understanding of the issues related to turbine selection, siting
and maintenance. |
|
| |
|
|
| |
Early American Turbines |
|
| |
|
|
| |
|
|
| |
| Carter 25kw |
Enertech 60kw |
Stormmaster 40kw |
|
|
| |
|
|
| |
Many of the early generation wind turbines experienced problems.
Windland learned how to repair and recondition wind turbines
in working through these problems. In the past, we've used this knowledge to offer reconditioned turbines to 3rd parties.
|
|
| |
|
|
| |
Impressed with the conservative design approach they were following,
Windland was one of the early adopters of European wind turbines
in the US. Windland was the first US wind farm to install the Vestas
V-25 series turbines. Bonus and Vestas turbines purchased in the
mid-80s and early 90s are still producing effectively on our Tehachapi
site. |
|
| |
|
|
| |
 |
|
Bonus 120kw
Turbines |
|
|
| |
|
|
| |
Four Generations of Vestas Turbines |
|
| |
|
|
| |
| Vestas 200 kw |
Vestas 225 kw |
Vestas 500 kw |
Vestas 660kw |
|
|
| |
|
|
| |
|
|
| |
 |
|
Example of Windwalls to maximize output from a
ridgeline |
|
|
| |
|
|
| |
Windland is presently upgrading smaller turbines
with several megawatt class turbines. To read more about these upgrades, click HERE. |
|
| |
|
|
| |
For Tehachapi and Repower site pictures, visit our PHOTO
GALLERY |
|